[IS-9521] – Adding Information to the Cube Silviculture – Forested (ha) X Realized (ha) datacube

Problem
It was requested the inclusion of new information in the Silviculture – Forested (ha) X Realized (ha) datacube.

Adopted Solution
The following information was inserted into the datacube:

  • Sub-compartment planting date
  • Expected / Performed Productivity
  • Sub-compartment genetic material
  • Sub-compartment spacing
  • Follow-up approval date
  • Follow–up reporting date

[IS-7470] – Climate: Climate Project – Measurement files for more than one layout

Problem
Currently, a station can generate a measurement file with a code different from the one that is registered in the SGF.

Adopted Solution
The system will disregard measurements that do not have the same station code that was selected in manual import or set in the automatic import file name.

Service Requests

[IS-9859] – Harvest: Adjustment in “Harvest – Stock”

Problem
“Harvest – Stock” cube displays the inventory information in relation to the cutting operation group, but does not display to the forwarding group.

Adopted Solution
We’ve added the following columns in “Harvest – Stock” cube:

  • “PHI – Forwarding”: Result of the subtraction between scheduled harvest production and forwarding group volume.
  • “Total PHI – Forwarding”: Result of the subtraction between total inventory and forwarding group volume.

[IS-9208] – Administration: Data Cube “Consulta Boletins de Silvicultura” does not appear parameter

Problem
User requests that the ” CD_PROCESSO_PAGAMENTO ” field appear as a column in the id 251 data cube “Consulta Boletins de Silvicultura (Realizado)”.

Adopted Solution
It was detected that the field was not in the select command of it’s view. Therefore, it was included in the command to be possible to display it at the data cube.

Problem

[ISTD-3092] – Harvest: Problem when pinning equipment on harvest app

Problem
Performed operations report is not working (Harvest / Control / Reports / Print Out (PDF) Reports / Performed operations).

Adopted Solution
Adjusted so the report is now working correctly.

[ISTD-3020] – Harvest: Search filters adjustment

Problem
“Harvest / Operational Planning / Operational Plan / Edit Harvest Sequence / Include SC” and “Harvest / Control / Closing / Release Follow-Up for Exhaustion” screens have a problem with search fields. “Site” field is not filtering “Operational Block” field and some filters doesn’t work.

Solution
The system has been adjusted so when selecting in “Site” field the “Operational Block” field must be filled correctly. Another search fields have been revised for better behavior.

[ISTD-2968] – Harvest: Spanish translations adjustment

Problem
Some Spanish translations are incorrect.

Adopted Solution
Those translations were corrected.

[ISTD-2967] – Harvest: Revision on payment process’ adjustment

Problem
Payment Process adjustment functionality (Harvest / Control / Closing / Payment Process) isn’t considering the values in a correct way and when it’s removed the payment process details keep the changes.

Adopted Solution
Payment Process adjustment functionality has been reviewed and is now considering values correctly. When removing some adjustment the payment process details must keep its original state.

[IS-9869] – Error trying to filter Generated Activities on the Transaction Transfer screen

Problem
An error occurred while attempting to filter a generated activity on the screen for transferring operations from monitoring interfaces.

Adopted Solution
The problem was fixed.

[IS-9809] – Mobile processing error and note

Problem
On the mobile data processing screen, there was an error filtering the records by work orders, on the imported follow-ups grid.

Adopted Solution
The problem was solved.

[IS-9763] – Transportation: Payment Process

Problem
In some situations where payment is limited by gross weight transported, the system was performing calculations with tithes that could generate small divergences in follow-up costs.

Adopted Solution
Corrections were made to the calculations to avoid cost divergences.

[IS-9704] – Transportation: Problem approving follow up with canceled invoice

Problem
The system allowed a follow up to be approved while an invoice associated with the follow up was being canceled at SEFAZ. This generated an inconsistency in the system.

Adopted Solution
It will only be allowed to approve follow ups if, if associated with an invoice, it has a “Processed” status.

[IS-9547] – Transportation: Duplicate correction letter sequence

Problem
The system is allowing the same sequence to be generated for two or more correction letters as the system calculates the next sequence in the screen loading. When the screen is opened by more than one user at a time, the correction letter sequence number is vulnerable.

Adopted Solution
The sequence of the correction letter will be calculated at the time of saving the correction letter, which will prevent the same number being generated for two or more users.

[IS-9413] – Transportation: Error in using invoice

Problem
The system tried to generate a invoice in contingency when presenting error to send to SEFAZ the XML of an invoice that had already been generated.

Adopted Solution
When sending XML to SEFAZ, even in case of errors, the system will not try to generate invoices in contingency, since sending XML is done after an invoice has already been generated.

This adjustment was only applied to customers located in Brazil.

[IS-9372] – Harvest: Improvement in Land Use Transition when processing Harvesting Finished Operations

Problem
When processing harvesting finished operations at an activity that has land use transition configuration with cycle/rotation transition, harvested subcompartment did not change land use class, and if subcompartment did not have projected subcompartment, nothing would be done.

Adopted Solution
Now it is possible on harvesting finished operation processing date, to change land use class on harvested subcompartment (actual), having or not a projected subcompartment in silviculture. It is possible configure a land use transition in harvest module even without the mark “Cycle/Rotation Transition”, in a way that change the harvested subcompartment class from “Planted” to “Harvested”.

[IS-9346] – Harvest: Adjustment in payment process approval

Problem
Payment process approval demand that user detail some payment previously (). If no payment is detailed the system show an error message.

Adopted Solution
This functionality has been changed so the system only considers selected items (), in other words, it’s not necessary that some payment be detailed for the operation be made.

[IS-9293] – Duplicate Price

Problem
When you edit a price line in SAP by changing the service code, after having included two duplicate lines in SAP, prices remain duplicated in the SGF after running the contract download interface.

Adopted Solution
When you edit a price line in SAP by changing the service code, after having included two duplicate lines in SAP, the contract download integration changes the SGF price line from the previous record to historical.

[IS-9235] – Sale: Invoice in “SVC-AN”

Problem
Error reprocessing an invoice with the issue type “SVC-AN”.

Adopted Solution
Set the WS_NFE to reprocess invoice where the issue type is “SVC-AN”.

Note: Invoice is specific to Brazil.

[IS-9136] – Transportation: Mobile – Wood Supply Logistics

Problem
The mobile transport application, specific to Delivery Note use, had an instability when processing delivery note without matching existing transport operational plan.

Adopted Solution
Corrections were made in the mobile and the message of non-existence of transport operational plan will be displayed.

[IS-8441] – Transportation: Yard Queue Panel

Problem
When generating a trip where the yard queue is automatic, automatic unloading is generated correctly, however the status of the yard queue is not being updated to be performed.

Adopted Solution
Update the status of the yard queue when performing automatic unloading.

[IS-7592] – String does meet system request will cause MISxMES Service stop

[IS-6236] – The VW_CUBO_VOL_CARV_EXP_FOR_TAL view is displaying the wrong Guide Source location and is extremely slow

[IS-2325] – MISxMES Sync issue

Incident

[IS-9982] – Reprogramming

Problem
There was a problem with the manual insertion of operations in the Silviculture operational plan.

Adopted Solution
The problem was resolved.

[IS-9818] – INFLOR’s Users Profiles

Problem
The Contract Enable screen, when in read-only mode, is keeping the “Import Price Items” and “Contract Enable Copy” buttons enabled.

Adopted Solution
When the Contract Enable screen is in read-only mode, the “Import Price Items” and “Contract Enable Copy” buttons are not displayed.

[IS-7497] – Asset: the system duplicates tariffs group in functionality “Rate calculation”

Problem
The functionality 6225 (Imobilizado / Custos / Cálculo de Tarifas) duplicates group of tariffs

Adopted Solution
An unscheduled correction was performed for the system to differentiate the tariffs group